Case Studies & Applications

60MM Revolutions - PCP Pumping

This was a first-time installation of a Black Mamba system in a PCP well, with performance that immediately exceeded expectations. From startup, the system delivered exceptional stability, reduced friction, and consistent load behavior across the full stroke. The results were operationally significant, demonstrating a clear improvement in reliability and overall efficiency compared to prior configurations.

Full Case Study

Guiding Fiberglass

After extensive success with Black Mamba's guided steel offering, a major operator requested Black Mamba to develop an application and method for fitting our patented Black Mamba single helical fin guides onto fiberglass sucker rods.

The trial was an overwhelming success (35x ROI), further catapulting Black Mamba's product and design philosophy to additional applications.

Full Case Study

Curve Pumping

An operator in North Dakota came to Black Mamba Rod Lift with specific goal in mind - lower the pump beyond kick off point in effort to chase fluid down hole. Having no experience with Black Mamba before, the initial use was ONLY for Black Mamba's sinker rod option.

Full Case Study

High Kick DLS

In Fall of 2022, Black Mamba presented its string design philosophy and product line up to a major operator in Hobbs, NM. This operator is openminded but recognizes that often vendors over-sell and under-deliver.

Black Mamba deployed its 7-per rod guide configuration on 1`` Norris rod. The operator after the inspection says we delivered 100%, and it was ``refreshing to see results after installation that spot on match the cited benefits of the product at the time of introduction.``

Full Case Study

Unpumpable Well Is Pumpable After All

After Black Mamba's technical presentation at the Southwest Petroleum
Short Course in Lubbock, TX, a world-wide producer with assets in the
Permian Basin asked for a visit to their offices. We presented our design philosophy and product lineup to a team of 30 engineers which ultimately netted a multi-well trial.

Of those 3 wells, an ``unpumpable well - the 51`` was selected and Black Mamba provided a design featuring 7-per and 4-per guide configuration throughout the Weatherford rod string. Black Mamba's sinker rod (1`` rod body, 3/4`` pin with 7-guides per rod) was used at the bottom of the well to accommodate the compression, then 4-per and 7-per as needed for sideload and DLS. 2 years later, the well encountered a 3/4`` 4 per rod part in the non-high DLS area.

Full Case Study

Anything and Everything

In Loco Hills, NM, a multi-well pad averaging 20 day run times before
intervention (after being converted to rod lift from ESP) needed
addressing. The worst well, often the first candidate for a trial run with Black Mamba's product, would not produce fluid longer than 9-days before rod failure. Although these wells were shallow (4,000 feet), a large tubing pump was utilized to produce over 1,000 bfpd. The result? 500 days+ before intervention.

Full Case Study

Uncontrollable Gas Interference Causes Constant Issues

A Bakken operator had their hands tied with this particular well. Habitual intervention costs had management planning P&A if a solution for rod pumping was not found. Compression related rod failures from gas interference and fluid pound netted MTF of less than 3 months. After finding Black Mamba through LinkedIn, there was a no-downside
installation of Black Mamba's 7-guides per rod configuration. The threshold for success: 4 months.

Full Case Study

High Speed, High Volume Pumping

An engineer at a major operator had already gained faith in Black Mamba's rod guide products through many prior installs. In Fall of 2021, Black Mamba approached this engineer and organization about pushing the limit to prove sucker rod stability with Black Mamba, even in high rod string velocities.

It is understood that with increased rod string velocity comes increased risk of rod string failure due to sucker rod instability and buckling (compression). If the rod string is centralized from end-to-end and controlled, how much cyclic compression can be put on the rod string, reliably?

Full Case Study

A Regional Major Leans On Black Mamba For Much Needed Reliability

A major Indonesian operator was experiencing numerous mechanical failures in a particular shallow well (#178) equipped with a sucker rod pump. The failures were mainly due to continuous contact between the rods and the tubing. The well is vertical with a pump depth at less than 300m (1000 ft) deep but appeared to have some unexpected dog legs. This resulted in rod failures, tubing leaks and excessive strain on the pumping equipment.
Well #178 averaged a Mean Time to Failure (MTF) of 195 days (6.5 months). The well experienced a total of eight (8) failures from February 2020 to November 2022. Production for well #178 consistently produced over 400 BFPD with a 98-99% water cut (net oil production of ~3 BOPD) before the Black Mamba installation.

Full Case Study

Progressive Cavity Pumping Is A Win With Black Mamba

An Indonesian operator was experiencing numerous mechanical failures in a particular well (M-37) equipped with a progressive cavity pump. The failures were mainly due to continuous contact between the rods and the tubing. The well is deviated (>43o) with a tortuous well path and significant dog legs. This resulted in rod failures, tubing leaks and excessive strain on the pumping equipment.

M-37 averaged a Mean Time to Failure (MTF) of 112 days (3.7 months). The average MTF for all wells in this operator’s two fields was ~180 days (6.0 months). Production for the M-37 consistently produced 18 BOPD with an 85% water cut (total production of 120 BFPD) before the Black Mamba installation.

Full Case Study

Chaotic Gas Interference Is No Headache.

In January of 2021, a Bakken operator was ready to throw in the towel on a 12,500 ft well with a MTF of 0.25 (3 month run times before intervention). The root - chaotic gas interference causing sucker rod instability. Black Mamba deployed a Complete Rod Control approach in 2021. By controlling the rod string during unpredictable moments of compression, bending moments and stresses are eliminated which reduces the issue of pre-mature sucker rod fatigue (rod parts).

The well ran for 18 months with zero interventions. At that time, the operator upgraded to the new and improved polyketone variant and the same 7-per steel rod guide configuration. 36 months later, finally, a failure and an inspection opportunity.

Full Case Study

All Other Rods (Non-Black Mamba) Require Replacement

A long time user of Black Mamba's product recently serviced a well for a downhole pump change. Recent interactions between Black Mamba and the customer encouraged feedback and inspection of prior run-in product. The results come back as expected - Black Mamba's Polyketone rod guides with enhanced bearing surface area and excellent wear resistance last.

Full Case Study

LET'S TALK

have a wild one? lets design together, today.

Contact Us

2025 CATALOG DOWNLOAD